Showing posts with label Switch. Show all posts
Showing posts with label Switch. Show all posts

Switch on for 4G service in Cumbria



EE plans to extend 4G services in Cumbria by March 2014 Mobile operator EE has turned on its 4G service in Cumbria, offering superfast broadband to more than 2,000 homes and businesses in the northern fells. The move follows trials in the Threlkeld area, where users experienced average download speeds of 24Mbps. The company plans to roll out 4G across the rest of Cumbria (another 100 sq-miles) by March next year. Experts said the cost of delivering superfast broadband wirelessly was much less than using fibre cables.

Welcoming the switch on, Rural Affairs Minister Dan Rogerson said: "Nothing will have a more spectacular effect on the rural economy than the roll out of superfast broadband and high speed mobile access. 'Frustrating time'. "I don't believe any rural business should be held back because of its location, so it's great that 2,600 Cumbrian homes and businesses are now covered by a superfast network." EE chief executive Olaf Swantee said: "There is a lot of work to do in 2014 to reach more people and businesses in rural areas. "But today we have proved that 4G has the capability to connect this country's unconnected [premises], and we intend to continue to be at the forefront of that."


Mal Hilton, chairman of the Northern Fells Broadband Group: "We have been working for the past three years to ensure rural parishes in this area of Cumbria do not miss out on the high speed broadband developments that are taking place across the UK. "It has been a frustrating time and most commercial companies have demonstrated a complete lack of interest. "For the residents of the northern fells this is a significant milestone in the journey towards a complete superfast broadband service and one we welcome wholeheartedly." Packages starting from £25 a month will be available from 6 December.


View the original article here

Sidel launches Bottle Switch to improve mold changeover time



Sidel claims that the result is a semi automatic system that reduces mold changeover time to less than a minute and cuts machine downtime by 50 per cent.
On an SBO 20 Universal2, for example, Sidel said full format changeover now takes 18 minutes ‘bottle to bottle’ for a single operator. The previous system needed two operators and the changeover took 33 minutes.

As well as saving time and reducing complications for operators, Sidel claims that with the new solution customers may avoid additional spending on storage silos and intermediate palletisation.


Semi-automatic


The Bottle Switch replaces what was a manual process with a semi-automatic solution. The system automatically brings the required blowing station in front of the operator, where it arrives already open.


The operator then just has to change the molds and this non-automatic part of the process is made easier as removal and installation in the mold support can be done tool free. Sidel claims that this step takes less than a minute to complete.


The Bottle Switch is available under Options & Upgrades for all recent generations of SBO Universal blow molders. By the end of 2010 the system will become available for all SBO Series2 and Combi machines.


Mold quality assurance is also one of Intertech Machinery Inc’s core competences.  We use only Japan and German imports mold steel.  Steel certificate, including the steel origin…steel property and composition data certified from the original steel producer can all be provided.  Now, due to the hard competition, the market is quite messed now with applying China imports lower price and lower quality steel.  We only insist to use only Japan and German imports steel to assure our quality level. Therefore, all our molds exported can be under good life guaranteed. Our website


View the original article here